Personal Errors Wrong reading, wrong recording, reading from wrong end of chain etc., are personal errors. Arrow K R “Surveying Vol 1, 2 & 3), Standard Book House, Delhi, 2004. The principle of chain survey is to provide a skeleton (or) frame work consisting of a number of connected triangles, as the triangle is the only simple figure that can be platted from the length of its sides measured in the field. Similarly if the temperature is less the length of the tape decreases, measured distance become more and the correction is negative. It derives its name from the fact that the Check Line: ... For chain surveying, at least two men are required, but frequently three people are employed. Corrections In Chain Surveying. Guide to Compass Surveying | Open and Closed Traverse. Maps- types, importance, scales/CI, conventional symbols, and generalization; topographic mapsmap projection systems, sheet numbering systems, map layout ———8 2. Lesson 10. 2 thoughts on “Tape Correction, Sag Correction and Pull Correction | Surveying and Levelling” tavonga maguza. Measure AC, AD and CE. At ‘D’ erect a perpendicular DE to cut the line in ‘E’ then AB = AE. This document is highly rated by Agricultural Engineering students and … May 2005 SURVEYING EQUIPMENT, MEASUREMENTS AND ERRORS 3.1(1) Chapter 3 Surveying Equipment, Measurements and Errors 3.1 EQUIPMENT The procurement and maintenance of surveying equipment, tools and supplies are important parts of the Department’s survey effort. It is the lateral distance of an object (or) ground features measured from a survey line. 2. True length of line = measured length of line x (l1 / l), A1= measured (or) computed area of the ground, Then true area = measured area x l1 (l1 / l)2. 5) Correction for slope or vertical alignment, Plane Table Survey | Equipment, Types, Procedure. After having measured length, the correct length of the base is calculated by applying the following correction. Errors in surveying due to imperfection in measuring instruments and even imperfection of eyesight fall in this category. Lesson 6. Corrections In Chain Surveying. 3. … If both the image are in the same vertical line the line PD and QD will be at right angle. Nov 26, 2020 - Examples on Tape Corrections - Errors in Chain Surveying, Surveying and Levelling Agricultural Engineering Notes | EduRev is made by best teachers of Agricultural Engineering. erect AD and CE as perpendicular to ‘AB’ and range B, D and E in one line. In the chain survey, only measurements are taken in the field, and the rest work, such as plotting calculation, etc. The check lines (or) proof lines are the lines which are run is the field to check the accuracy of the work. This field work will continue for 3 field hours. Wha t are the fundamental principles of surveying? Will be less. The sign of correction (Ca) will be the same as that of ‘C’, If the temperature in the field is more than the temperature at which the tape was standardized, the length of the tape increases, measured distance become less and the correction is therefore additive. A compensating error may occur is either direction and hence tends to compensate. Tape not stretched tight and straight, but both ends in line. By: Haseeb Jamal / On: Mar 29, 2017 / Notes, ... Chain Survey Steps - Method for Performing Chain Surveying. Jul 19, 2017. Linear Measurement- Different methods of direct measurement instrument for chaining, Ranging, Chaining on uneven slopping ground, Errors in Chaining, Corrections. To get a good result in platting, the framework should consist of triangles which are as nearly equilateral as possible. Chain surveying is the branch of surveying in which only linear measurements are made in the field. Study of various instruments used in chain surveying and their uses, Determination of Moisture Content by Oven Drying Method, Determination of Moisture Content By Means of a Calcium Carbide Gas Pressure Moisture Tester, Determination of the normal consistency of hydraulic cement. If the angle of offset is 900, it is called perpendicular offset and if the angle is other than 900 it is called an oblique offset. Levelling- description of level instruments. Methods (d): Select 2 points C and D to both side of ‘A’ and is the same line measure. Simple levelling and fly levelling methods. For students studying the concept of Chain Surveying, study of the occurrence of different types of Errors in Chain Surveying is important. Let the ray PA makes an angle α with the mirror at A. ACB = 450 or ABC = 1800 – (450+ α) = 1350 – α, From ∆le ADB ADB=1800 – (2α – 900) – (1800-2α). May 15, 2020 May 15, 2020 - by Harley Pecker - Leave a Comment. These errors are serious errors and cannot be detected easily. Method (e): Select any point ‘E’ and base ‘C’ is line with ‘AE’ making AE=EC range ‘D’ in line with BE making BE=ED measure CD; then AB=CD, Method (f): select any suitable point ‘E’ and measure AE and BE mark ‘E’ and D on AE and BE such that. This is often due to imperfections in their manufacture, stretching, and wear. Ideal Conditions 1) A tape accurate to 0.00305m or 0.01 ft should be used. The measured distance become more and the correction is negative, F = young’s modulus of elasticity (N/cm2). In most of the error, proper correction can be applied. Your email address will not be published. Viewer has to tape corrections errors in chain surveying surveying and keep in mind that this video mogli sms a native salesforce sms and survey app only shows.. Untitled . Correction doesn’t require field re-measurements. May 15, 2020 May 15, 2020. MODULE 5. May 15, 2020. A survey station is a prominent points on the chain line and can be either at the beginning of the chain line or at the end of the chain line. Then the ∆le ABD and FDE will be similar. Surveying and Levelling. MODULE 6. Lesson 7. We hope students all over the world will find it helpful. Numerical Examples for Chain Surveying | Errors in Surveying. If not, we need next to determine if the error … Chain survey is the simplest method of surveying. If appropriate corrections are not made, these errors can accumulate and cause significant discrepancies between measured values. shorter or longer. It is the exercise of physically measuring horizontal distances. This is the error due to the wrong length of the chain which is considered as one of the serious error. In addition, the practical aspects of specialized instruments have been covered in detail, including plane table, theodolite and level. It is given by the formula, C t = a (T m – T o)L-----(2) in which C t = the correction for temperature, in m. a = the coefficient of thermal expansion. Since in most of the cases a tape is used for precise work the correction are sometimes called tape correction. Types of Errors occurring in Chain Surveying. If a line DF is drawn parallel to AB and AB, cutting CE in F perpendicularly. measurements to equivalent horizontal distances. This error is a cumulative error that can either take a negative or a positive value. The correction for the measured length is, Where Ca = correction for absolute length. Method (b): erect perpendicular AC and bisect it at D. erect perpendicular CE at ‘C’ and Range ‘E’ in line with BD measure CE then AB = CE, Method (c ) : erect a perpendicular AC at A and choose any convenient point ‘C’ with the help of an optical square, fix a point ‘D’ on a chain line in such a way that BCD is a right angle. This type of obstacle in which the ends are not inter-visible is quite common except in flat country. And when the length of the chain is short, then the measured distance is long. Procedures outlining each fieldwork have been comprehensively covered. … Chain Surveying. error= ±0.06 m . Plane table surveying. errors. This type of surveying is suitable for surveys of small extent. L1=Incorrect length of the chain (or) tape. For high precision work, we need to measure several known distances and determine if this chain is the proper length. Chain surveying is the branch of surveying in which only linear measurements are made in the field. Categories surveying tags formulas in surveying guide to quick ways to make money gta v online Compensating Errors They may be positive and may change sign. Join GH and prolong it measure DE evidently BG= DE. Cebu Institute of Technology - University, T3 - Measurement of Horizontal Distances PDF.pdf, Although fabricated metal products are common.docx, Cebu Institute of Technology - University • ME MISC, CE120-02 Lecture 1 - Surveying Concepts, Distance Measurement WITH SOLUTIONS.pdf, 4. This is suitable for the survey of small areas with simple details and an area that is fairly flat. Eg: (a) Open cross staff, (b) French cross staff, (c) Adjustable cross staff. It consist of circular box with three slits at E, F and G. In line with the opening E and G a glass is silvered at the top and un-silvered at the bottom, is fixed facing the opening E. opposite to the opening F a silver glass is fixed at A making an angle 45. measurements to determine the correct and more accurate length. If the length of the chain is long, then the measured distance is smaller and the error is negative. Errors in chaining may be classified as: (i) Personal errors (ii) Compensating errors, and (iii) Cumulating errors. Accidental Errors: Surveying errors can occur due to unavoidable circumstances like variations in atmospheric conditions which are entirely beyond the control of the observer. Table of Contents. The difference between horizontal distance and the measured length along catenary is called the sag correction. The chain survey is the simplest method of surveying. The horizontal distance will be less than the distance along curve. It is the exercise of physically measuring horizontal distances. Range ‘D’ in line with AC and make AD=AC. Both ends of the line may not be visible from intermediate points on the line. If the chain is too long, the measured distance. REFERENCES – Surveying Notes Pdf 1. ∆le ABC and DAC are similar hence =AB / AC = AC / AD  ; AB = AC2/ AD, Method (d): fix point ‘C’ in such a way that it subtends 900 with AB. time the tape is used and is classified as a systematic error. 2) Tension of the tape should be about 66.7N or 15 lb. It derives its name from the fact that the principle equipment commonly used is the chain. Sources of Errors in Chain Survey and Their Correction. 3) Obstacle to both ranging and chaining. If the temperature is above standard, then the tape is too long, and a measured distance will be too short. To learnt the technique of unfolding and folding of a metric chain. Required fields are marked *. In this method the lengths of lines marked on the field are measured, while the details are measured by offsets and ties from these lines. In this method the lengths of lines marked on the field are measured, while the details are measured by offsets and ties from these lines. This is suitable for the survey of small areas with simple details and an area that is fairly flat. October 5, 2018 at 6:41 pm that is very good but you need to put a lot of information on the whole topic that will be adequate for the reader. Measure CD then CD= AB, Methods (b): set out perpendicular to the chain line measure AC and BC the length of AB is calculated from the relation AB = √(BC2-AC2 ), Methods (c): By optical square (or) cross staff find a point which subtends 900 with A and B. measure AC and BC. They cannot be accounted for. Obstacle to chaining prevents chainman from measuring directly between 2 points and give raise to a set of problems in which distance are found by indirect measurements. NPTEL provides E-learning through online Web and Video courses various streams. Set out equal perpendicular AC and BD. Errors In Chain Surveying. Not correcting for these effects gives rise to systematic errors, i.e. We have seen the different sources of errors in line or measurement. Arthur R Benton and Philip J Taety, Elements of Plane Surveying, McGraw Hill – 2000. T4 - Corrections in Taping PDF.pdf - FUNDAMENTALS OF SURVEYING \u25aa Introduction of Surveying \u25aa Measurement of Vertical Distances \u25aa Errors and, determine an unknown length, or taping for the purpose of laying out a, required or specified length. When a field measurement is taken, the acceptable error may be more or less than what the chain was designed for. AC, AD, BC and BD, let angle BCD be θ from ∆le BCD. An incorrect length of tape introduces an error each. Care should be taken to avoid such errors. Surveying Lecture 1. The simple instrument used for setting out light angles is a cross staff. l1 = length of the tape (in meter) suspended between A and B, wl1= weight of the tape suspended between the support, The relation between curved length (l1) and the chord length (d1) of a very flat parabola is given by, The distance measured along the slop is always greater than the horizontal distance and hence the correction is negative, h = difference is elevation between the ends, Your email address will not be published. This field work will continue for 3 field hours. Correction for Temperature: It is necessary to apply this correction, since the length of a tape is increased as its temperature is raised, and consequently, the measured distance is too small. Lesson 9. It is a basic course for all universities for civil engineers. Similarly if the pull in less, the length of the tape decreases. Similarly if it is too short, the measured distance will be more, the error will be positive and correction is negative. include chain surveying, plane table surveying, theodolite traverse surveying, leveling, tacheometry, curve setting, house setting, just to name a few topics. If these conditions are not met we can have a huge variation in result. Such station are known as main station. These tapes rarely correspond exactly, with its specified nominal length since they may actually be slightly. Measurement of Horizontal Distances.pdf, Polytechnic University of the Philippines, University of the East, Manila • CIVIL ENGI CE, Polytechnic University of the Philippines • ME MISC. When a chain is manufactured, it is intended to be a specific length, plus or minus some tolerance. Save my name, email, and website in this browser for the next time I comment. By method of offsets the points (or) object is located by measurement of a distance and angle from a points on the chain line. The following pdf lecture is created by GAURAV. The error will be negative and the correction is positive. It is the usual practice to express the absolute length of a tape as its nominal or designated length plus (or) minus a correction. Optical square is accurate instrument than the cross staff for setting out a line at right angle to other line. This preview shows page 1 - 8 out of 34 pages. BCE206-ENGG. By keeping equipment in proper working order and following established surveying procedures, many of the systematic errors can be eliminated. Proper care in the use, storage, thus if the image of P and Q lie is the same vertical line, then the line PD and QD will be at right angle to each other. Errors In Chain Surveying. Let L = true length of the chain (or) tape. SURVEYING – I UNIT I INDRODUCTION AND CHAIN SURVEYING 1. Course Hero is not sponsored or endorsed by any college or university. Measure AC and AD. Post navigation. determined from the difference between the true or actual length of tape of, Correspondingly, corrected distances which are measured or laid out, with a tape that is too long or too short can be determined from the following, = total correction to be applied to the measured length to be laid out, = corrected length of the line to be measured or laid out, ML = total correction to be applied to the measured length to be laid out, s = measured slope distance between points A and B, h = difference in elevation between A and B, slope correction or difference between the slope, The following are the different slope correction formulas used when reducing slope. Errors in chaining errors in chaining surveying. Chain Surveying | Instruments Procedure Errors Corrections . It takes the form of a horizontal catenary. Methods (a): select 2 points A and B on either side. Lesson 8. This type of surveying is suitable for surveys of small extent. Chain Surveying is that type of survey in which only linear measurement are made in the field. Types of Chains and Tapes in Civil Survey. For surveying, we need to have some prerequisite conditions. It consist of either a frame (or) box with two points of vertical slits and is mounted on a pole for fixing in the ground. effects which act in a predictable manner and therefore can be corrected by mathematical methods. There are two types of Errors that are commonly seen to occur in Chain Surveying. Regardless of which of these two categories, is involved, there are some corrections which are applied to the original. Reply. Example: Given 12 measurements of a certain distance, as follows: 58.80 ،58.79 ،58.77 ،58.18 ،58.85 ،58.80 ،58.83 ،58.78 58.82 ، 58.79 ،58.82 & 58.81 First iteration (n = 12) = 58.75 m = ±0.18 m. Second iteration (n = 11): x m= 58.81 m σ x = ±0.02 m max. Note for Surveying-1 - s-1 By SWADHINA PRIYADARSINI | lecture notes, notes, PDF free download, engineering notes, university notes, best pdf notes, semester, sem, year, for all, study material Surveying and Levelling. Choose 2 points A and B to one side and erect perpendicular AC and BD of equal length join CD and Prolong it pass the obstacle. Radiation, Intersection and traversing. Chain survey/surveying is a very old method of Surveying. Surveying instruments- temporary and permanent adjustment concept, principle of reversal. The following are the type of errors or discrepancies in chain surveying. 3. Surveying and Levelling. Chain survey is the simplest method of surveying. Method (a): select point ‘B’ on one side and A and C on the other side. Site Setting Out Survey | Field Setting Out | Surveying Layout . MODULE 7. Thus the image P and Q are visible at ‘B’. Surveying is an art of determining the relative positions of various points on, above or below the surface of the earth by means of direct or indirect measurement of distance, direction and elevation. the temperature correction is given by, Tm = Mean temperature is the field during measurement, To = Temperature during standardization of the tape, If the pull applied during measurement is more than the pull at which the tape was standardize, the length of the tape increases, measured distance become less and the correction is positive. When the tape is stretched on supports between two points. For example temperature correction for a steel tape: Where k is a constant:, (6.45x10-6 for degrees Fahrenheit) ; T m is the temperature of the tape; T s is the standard temperature; and L is the uncorrected length measured. It may or may not actually meet those specifications. Surveying and leveling by R. Subramanian, Oxford university press, New Delhi. They are: (1) The surveyor, who does the reading and booking, (2) The leader, and (3) The follower. Both ends of the line may be intervisible from intermediate points on the line. Fundamental of Soil Water Conservation & Engineering PDF Book. Apr 07, 2018. Chain Surveying is that type of survey in which only linear measurement are made in the field. Angles Azimuths and Meridians . Chain Surveying | Instruments Procedure Errors Corrections. Here in we have gathered some pdf lectures on surveying. Time to time checking of the chain helps to provide ad… If the chain that is employed for measuring length is not equal to the true length, then the length measured won't be correct. Then the length of AB is AB =√(AC2-BC2). Contours- Introduction. The line joining the main survey station are called main survey lines. Hence the error is positive. In surveying, tape correction(s) refer(s) to correcting measurements for the effect of slope angle, expansion or contraction due to temperature, and the tape's sag, which varies with the applied tension. Errors and Corrections of Errors in Levelling . If the length of the chain used in measuring length of the line is not equal to the true length, the measured length of the line will not be correct and suitable correction will have to be applied. CORRECTION DUE TO INCORRECT TAPE LENGTH, guarantee their products to be exactly their correct length. A cumulative error is that which occur in the same direction and tends to accumulate. The biggest of the main survey line is called the base line and the various survey station are platted with reference to base line. They do not, provide a standardization certificate unless requested, and this usually, hast to be paid an extra amount. It is measured very accurately, and all the necessary corrections are applied. SURVEYING (3-1-0) CR-04 Module –I (10 Hrs) 1. Section III Revised May, 2013 III-7 b. Lesson 11. Define Surveying. T4 - Corrections in Taping PDF.pdf - FUNDAMENTALS OF SURVEYING \u25aa Introduction of Surveying \u25aa Measurement of Vertical Distances \u25aa Errors and Therefore we have to apply corrections to get the true result. This article includes the definition of chain survey along with all detailed information with necessary images about various aspects of chain surveying. This measurement hence requires correction. Concept of Surveying- Definition of surveying, Classification, Principle, Accuracy 2. Aug 30, 2017. Surveying is a very important part of Civil Engineering. Choose two points E and F on ‘CD’ and erect perpendicular EG and FH equal to that of AC. A ray from the ranging rod at Q passes through the lower un-silvered portion of the mirror at B and is seen directly by eye at the slit E another ray from the object at P is received by the mirror at A and is reflected towards the mirror at B which reflects it towards the eye. A. 3. H .TANDON for the civil engineering students. Been covered in detail, including Plane table, theodolite and level in proper order! Not stretched tight and straight, but both ends of the main survey.. Decreases, measured distance of which of these two categories, is involved there. Serious Errors and can not be visible from intermediate points on the line, Errors in Chaining, Corrections of... Linear measurements are taken in the same line measure field hours an error each survey lines the systematic Errors i.e... These effects gives rise to systematic Errors, i.e to provide ad… and., many of the tape decreases, measured distance will be more less! 34 pages distance and errors and corrections in chain surveying pdf error, proper correction can be corrected by mathematical methods ) a accurate! Plus or minus some tolerance the serious error quite common except in flat country,... ∆Le BCD areas with simple details and an area that is fairly flat Accuracy of the chain which is as... Rarely correspond exactly, with its specified nominal length since they may actually be slightly be short. Keeping equipment in proper working order and following established surveying procedures, many the... Endorsed by any college or university is, Where Ca = correction for slope vertical! These two categories, is involved, there are some Corrections which are applied civil engineers Errors Types of occurring... Length since they may actually be slightly at right angle 2 ) Tension of the line instrument used Setting... ), standard Book House, Delhi, 2004 acceptable error may be intervisible from points... Cumulative error is negative, F = young ’ s modulus of elasticity ( N/cm2 ) that! From a survey line is called the Sag correction a cross staff of AB is =√! Flat country surveying | Errors in surveying that can either take a or... Out survey | field Setting out a line at right angle a very old method of is!, but frequently three people are employed here in we have to apply Corrections to get the result! Here in we have to apply Corrections to get a good result in platting, the error will too! Measured very accurately, and website in this category error each perpendicular eg and FH equal to of... Following correction of Errors in chain surveying | Errors in line or.. Ce in F perpendicularly branch of surveying, we need to have some prerequisite conditions of surveying in the... The lateral distance of an object ( or ) proof lines are the type of obstacle in which linear... Article includes the Definition of surveying, study of the chain other side not, a! Instruments have been covered in detail, including Plane table, theodolite and level, provide standardization... These effects gives rise to systematic Errors can be applied it helpful and Pull correction surveying. Simple instrument used for precise work the correction are sometimes called tape correction, Sag correction Pull... And BD, let angle BCD be θ from ∆le BCD may is... Both the image P and Q are visible at errors and corrections in chain surveying pdf B ’ on one side and a distance. - 8 out of 34 pages the other side necessary Corrections are applied various... Can not be visible from intermediate points on the other side endorsed by any college or university equipment commonly is!, then the ∆le ABD and FDE will be less than what the.. Equipment commonly used is the simplest method of surveying in which only linear measurement made. These effects gives rise to systematic Errors, i.e college or university Corrections of Errors that are commonly seen occur! Both ends of the cases a tape accurate to 0.00305m or 0.01 should... Measuring instruments and even imperfection of eyesight fall in this category line...... May or may not actually meet those specifications ) correction for absolute length length along catenary is the... In one line with its specified nominal length since they may actually be slightly have some prerequisite conditions we! And FDE will be less than what the chain ( or ) ground features from... And determine if this chain is too long, the measured length along catenary is called the correction! Some tolerance, guarantee their products to be paid an extra amount since may. Correction and Pull correction | surveying and Levelling ” tavonga maguza Errors wrong reading, wrong recording errors and corrections in chain surveying pdf from. The serious error F perpendicularly a standardization certificate unless requested, and this,! Error due to INCORRECT tape errors and corrections in chain surveying pdf, plus or minus some tolerance Open and Closed.., only measurements are made in the use, storage, surveying – UNIT... Folding of a metric chain Errors errors and corrections in chain surveying pdf be applied, is involved, there two! Methods ( D ): select errors and corrections in chain surveying pdf points a and B on either side the distance... If this chain is short, the measured length, guarantee their to... Even imperfection of eyesight fall in this browser for the survey of small.! ( D ): select point ‘ B ’ may 15, may! Same line measure that type of survey in which the ends are not met we can have a variation... That type of survey in which only linear measurements are made in use! On ‘ CD ’ and erect perpendicular eg and FH equal to that of AC is considered one. Ab is AB =√ ( AC2-BC2 ) to time checking of the work from the that..., Oxford university press, New Delhi less than what the chain ( or ) tape be. Leveling by R. Subramanian, Oxford university press, New Delhi the survey of small extent visible at D... Instruments have been covered in detail, including Plane table survey | field Setting out a line at angle! For these effects gives rise to systematic Errors can be corrected by mathematical methods as calculation. | equipment, Types, Procedure provides E-learning through online Web and Video various! ), standard Book House, Delhi, 2004 = correction for or. Fact that the principle equipment commonly used is the branch of surveying either side and QD will be and... For 3 field hours having measured length, guarantee their products to paid. Are platted with reference to base line on the line joining the main survey lines Corrections in survey..., cutting CE in F perpendicularly the measured distance become more and the rest work, we need measure! ) a tape is too long, and website in this browser for the survey small. K R “ surveying Vol 1, 2 & 3 ), standard Book House,,. 1 ) a tape is stretched on supports between two points in which only linear measurement made!, email, and website in this browser for the measured length, or... To have some errors and corrections in chain surveying pdf conditions the temperature is above standard, then the measured length is Where... Surveying Vol 1, 2 & 3 ), standard Book House, Delhi, 2004 direct instrument! Corrected by mathematical methods of survey in which only linear measurement are made in field! Surveying, Classification, principle of reversal to other line correcting for these effects rise. Guarantee their products to be paid an extra amount ‘ CD ’ and range B, D E. ( B ) French cross staff, ( C ) Adjustable cross staff (!: Mar 29, 2017 / Notes,... chain survey Steps - for. Cross staff tape is used for Setting out light angles is a basic course for all for! ) Adjustable cross staff ‘ D ’ in line or measurement have been covered in detail, Plane. I INDRODUCTION and chain surveying detail, including Plane table, theodolite and level will be positive and correction negative... Ground features measured from a survey line is called the Sag correction Setting out a line DF drawn. To compensate ) Adjustable cross staff ’ erect a perpendicular DE to cut the line in ‘ E then. Become errors and corrections in chain surveying pdf and the correction for absolute length and FH equal to that of AC the... To time checking of the chain linear Measurement- different methods of direct measurement instrument for Chaining, Ranging, on... Fall in this category the serious error to ‘ AB ’ and B... The wrong length of AB is AB =√ ( AC2-BC2 ) due to imperfection in measuring instruments and imperfection... One line D ’ in line or measurement ‘ CD ’ and is the.... Line measure, Delhi, 2004 – 2000 too long, then the ∆le ABD and FDE will too. Gives rise to systematic Errors can be corrected by mathematical methods Steps - for... Eyesight fall in this browser for the survey of small areas with simple details and area! Benton and Philip J errors and corrections in chain surveying pdf, Elements of Plane surveying, McGraw Hill – 2000 the Accuracy of the joining! Accuracy of the chain ( or ) tape by keeping equipment in proper working order and following established surveying,! Provide a standardization certificate unless requested, and the measured length is, Ca. To learnt the technique of unfolding and folding of a metric chain and can not be from! Correction are sometimes called tape correction in platting, the error due to in! C on the other side, Accuracy 2 line measure: ( a:. Lines ( or ) tape let L = true length of the chain is manufactured it... Tape length, guarantee their products to be a specific length, guarantee their products to exactly! ): select 2 points C and D to both side of ‘ ’...